Next, time the digging operation on the excavator. Start off in the event the bucket starts to dig in, and end when it begins to dig on another load. Divide that number by 60 to find the cycle time to the excavator.A thoroughly clean-up bucket is essentially an all-in-a single finishing bucket that will degree a surface area and haul away big loads